The result
±4%
Cost variance
12→1
Vendors
−9d
Reporting lag
The problem

A DTC nutrition brand ran creator campaigns across a dozen vendors with no shared model. We consolidated the work into one operating capability.

Consolidating twelve vendors into one operating team collapsed reporting lag and brought cost variance inside a governed band.

Start a system

Build a creator system that can actually operate.